Petronas Carigali, Malaysia

From a pilot project to a successful solution

The leader of the Malaysian oil and gas industry launched a pilot project by installing the Multiphase Pump Technology at one of their fields.

The system was set up and successfully commissioned at Tembungo-B, an unmanned offshore satellite platform in Sabah Waters in August 2007.

The Tembungo oil fields consists on an integrated production
and processing platform, the Tembungo-A and Tembungo-B. The unprocessed mixture of gas and crude from Tembungo-A is routed by a 6 inches trunk line departing to Tembungo-B.

In order to guarantee the customer the highest degree of security Bornemann installed an on skid control system.