Lukoi, Komi, Siberia

Pumptype: MPC 208
 
In 2005, Bornemann delivered 6 multiphase pump systems, to be
installed at Haryaginsk and East-Masterelysk oil deposit. The scope of supply consisted of six containerized multiphase pumps in arrangement of three (A, B and C for each one of the fields) and one containerized control and power supply system. The pump containers will be installed in parallel and can be operated individually, in pairs or all together.