2.5 MW Test Field
With all Multiphase Pumps a full load pump performance test will be conducted in accordance to the relevant test procedures Such a test will be performed to ensure the guaranteed performance and quality capabilities of the pump under load conditions.
All Frame Size 10 Multiphase Pumps will be tested on Bornemann’s standard 2.5 MW test field, where the pumps are installed to an electrical test motor including torque measurement, piping, flow meters of test loop and instruments. The test field is equipped with the necessary cooling equipment and high pressure separators for a real unique multiphase test. If required a long term test is possible on this test bed.
System Assembly
With our system assembly facilities we are able to supply complete multiphase pumping systems, completely pre tested and suitable for plug and pump arrangements.
Multiphase Pump System
Typically the skid mounted pump and motor arrangement is equipped with all necessary instrumentation and a PLC based control system. All functions of the pump system together with the electrical drive system with motor, variable frequency converter and transformer cabinets will be pre tested in our factory. A system factory acceptance test prior to shipment is our standard procedure.
References
- Canadian Natural Resources Int.
Ninian North Platform, North Sea
- Petrolera Ameriven
Hamaca Project, Venezuela
- Canadian Natural Resources
Primrose Field, Canada
- ICOFC
West Paydar Oil Field, Iran
- Cairn Energy Ltd.
Ravva Oil Terminal, India
|