Hamid Libya

Pumptype: MPC 268

In 2004, the first multiphase boosting system was installed in Libya. The multiphase pump system was boosting the well production over a distance of 40 km from the Hamid station to the Nakhla area. Highlight of the smart-system is the control system, for fully automatic and remote operation of the pump system.