Groupement Sonatrach AGIP, Algeria

A turn-key solution

In January 2008 Bornemann proved itself as a solid partner for turn key solutions by delivering two complete in parallel operating Multiphase Pumps to an Algerian company consortium.

The systems were engineered, designed and manufactured to boost an oil, gas and water mixture over a distance of 70 km to a process plant.

To guarantee the highest level of safety Bornemann equipped all control containers with a highly reliable redundant PLC System and a fire detection and fire fighting system.

Another successfully solved challenge was the shipment of the total scope of supply. 16 heavy loaded trucks delivered the complete package to full customer‘s satisfaction.